Recently, the WP11 project of SASEC Phase II in Bangladesh has completed the paving of the first asphalt test section.
It is Yalong's YL4000 asphalt mixing plant that provides high-quality asphalt mixture for this project. It has the characteristics of accurate measurement, uniform mixing and high output, which can meet the needs of different working conditions.
Project Introduction
The SASEC-II project in Bangladesh is an important part of the construction of the Northwest Corridor of South Asian Subregional Economic Cooperation. The project is about 300 kilometers away from the capital Dhaka and connects 16 important towns in the northwest of Dhaka. After completion, it will greatly relieve Bangladesh's existing traffic pressure, improve road safety and cargo transportation capacity, and at the same time demonstrate China's strength to the world!
2023.05.22