Operation and maintenance during the running-in period of the product asphalt mixing plant:
1. For special vehicles, the operating staff should receive the training and leadership of the manufacturer, have a sufficient understanding of the structure and function of the machine, and obtain certain operation and maintenance experience before operating the machine. . The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, it is necessary to read the operation and maintenance manual, and operate and maintain according to the requirements of the manual.
2. Pay attention to the working load during the running-in period of the mixing plant. Generally, the working load during the running-in period of the asphalt mixing plant should not exceed 80% of the additional working load, and an appropriate workload should be arranged to avoid overheating caused by the continuous operation of the machine for a long time. attack.
2023.12.29
Submit Request